    Engineering, Project General Management and Business Development experience. All round upstream & downstream industry knowledge including offshore and onshore. More than a decade record of successfully leading the development of major international infrastructure projects including: central processing plants, power plant, compression plant, reception & metering terminals, offshore and onshore Brownfield/Greenfield projects. Demonstrable track record of establishing and maintaining sound business controls to turn around inherited dysfunctional situations. Keen eye for selecting and building high performing delivery focused teams and organizations. Effective in sensitively managing multicultural environments.

Parcours

Project Manager - Total

Chez E&P Offshore

De janvier 2014 à aujourd'hui
Project Manager - Total E&P Offshore Jan 2014 - to present Various Projects - Abu Dhabi Offshore 115 M$ Project ...
Lire la suite
 

Project Manager - Total

Chez E&P Offshore

De janvier 2014 à aujourd'hui
Project Manager - Total E&P Offshore Jan 2014 - to present Various Projects - Abu Dhabi Offshore 115 M$ Project ...
Lire la suite
 

Project Manager - Total

Chez E&P Offshore

De janvier 2014 à aujourd'hui
Project Manager - Total E&P Offshore Jan 2014 - to present Various Projects - Abu Dhabi Offshore 115 M$ Project ...
Lire la suite
 

Package Manager

Chez Total E&P

De décembre 2010 à juin 2013
Kharir Power Plant (KPP) - Yemen 200 M$ Kharir Power Plant (KPP) - Abu Dhabi 200 M$ Detail Engineering, Procurement and Installation of Company Items Project Description: The aim of this project was to electrify Kharir Field using an overhead 33KV network connected to a single generating ...
Lire la suite
 

Package Manager

Chez Total E&P

De décembre 2010 à juin 2013
Kharir Power Plant (KPP) - Yemen 200 M$ Kharir Power Plant (KPP) - Abu Dhabi 200 M$ Detail Engineering, Procurement and Installation of Company Items Project Description: The aim of this project was to electrify Kharir Field using an overhead 33KV network connected to a single generating ...
Lire la suite
 

Package Manager

Chez Total E&P

De décembre 2010 à juin 2013
Kharir Power Plant (KPP) - Yemen 200 M$ Kharir Power Plant (KPP) - Abu Dhabi 200 M$ Detail Engineering, Procurement and Installation of Company Items Project Description: The aim of this project was to electrify Kharir Field using an overhead 33KV network connected to a single generating ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De mai 2008 à octobre 2010
Basement Processing Unit (EPCC) - Yemen 200 M$ Basement Processing Unit (EPCC) - Cairo 200 M$ EPC Contract awarded to Engineering for the Petroleum and Process Industries (ENPPI). Company engineering representative and Deputy project manager within ENPPI Cairo offices. Project ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De mai 2008 à octobre 2010
Basement Processing Unit (EPCC) - Yemen 200 M$ Basement Processing Unit (EPCC) - Cairo 200 M$ EPC Contract awarded to Engineering for the Petroleum and Process Industries (ENPPI). Company engineering representative and Deputy project manager within ENPPI Cairo offices. Project ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De mai 2008 à octobre 2010
Basement Processing Unit (EPCC) - Yemen 200 M$ Basement Processing Unit (EPCC) - Cairo 200 M$ EPC Contract awarded to Engineering for the Petroleum and Process Industries (ENPPI). Company engineering representative and Deputy project manager within ENPPI Cairo offices. Project ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De décembre 2007 à juin 2008
Central Compression Unit 95 M$ Central Compression Unit 95 M$ Detail Engineering / Construction follow up Project Description: The objective of the project was to replace the operating mode at the Kharir Basement wells pads by a multiphase production system, with minimum facilities at ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De décembre 2007 à juin 2008
Central Compression Unit 95 M$ Central Compression Unit 95 M$ Detail Engineering / Construction follow up Project Description: The objective of the project was to replace the operating mode at the Kharir Basement wells pads by a multiphase production system, with minimum facilities at ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De décembre 2007 à juin 2008
Central Compression Unit 95 M$ Central Compression Unit 95 M$ Detail Engineering / Construction follow up Project Description: The objective of the project was to replace the operating mode at the Kharir Basement wells pads by a multiphase production system, with minimum facilities at ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De septembre 2006 à mai 2008
Self Contained Processing Facilities and others Above 15 M$ Self Contained Processing Facilities and others Above 15 M$ Project Description: Engineering studies coordinated in conjunction with Operation & Development team in Yemen (Sanaa) and Head Quarter Paris. * Self Contained ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De septembre 2006 à mai 2008
Self Contained Processing Facilities and others Above 15 M$ Self Contained Processing Facilities and others Above 15 M$ Project Description: Engineering studies coordinated in conjunction with Operation & Development team in Yemen (Sanaa) and Head Quarter Paris. * Self Contained ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De septembre 2006 à mai 2008
Self Contained Processing Facilities and others Above 15 M$ Self Contained Processing Facilities and others Above 15 M$ Project Description: Engineering studies coordinated in conjunction with Operation & Development team in Yemen (Sanaa) and Head Quarter Paris. * Self Contained ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De avril 2006 à mai 2008
Basement Processing Unit (FEED & Call For Tender) 200 M$ Basement Processing Unit (FEED & Call For Tender) 200 M$ Concept, Pre project, Feed Engineering, CFT issuance * Call for Tender and Contract preparation; follow up of tendering phase with international bidders. Recommendation ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De avril 2006 à mai 2008
Basement Processing Unit (FEED & Call For Tender) 200 M$ Basement Processing Unit (FEED & Call For Tender) 200 M$ Concept, Pre project, Feed Engineering, CFT issuance * Call for Tender and Contract preparation; follow up of tendering phase with international bidders. Recommendation ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De avril 2006 à mai 2008
Basement Processing Unit (FEED & Call For Tender) 200 M$ Basement Processing Unit (FEED & Call For Tender) 200 M$ Concept, Pre project, Feed Engineering, CFT issuance * Call for Tender and Contract preparation; follow up of tendering phase with international bidders. Recommendation ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De mars 2006 à août 2006
Export Debottlenecking Pipeline - Yemen 30 M$ Basic and Detail engineering, followed by Construction Call for Tender (CFT) issuance Project Description: The aim of this project was to increase the export capacity of the existing 10'' export pipeline with a maximum working pressure of 45 bars ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De mars 2006 à août 2006
Export Debottlenecking Pipeline - Yemen 30 M$ Basic and Detail engineering, followed by Construction Call for Tender (CFT) issuance Project Description: The aim of this project was to increase the export capacity of the existing 10'' export pipeline with a maximum working pressure of 45 bars ...
Lire la suite
 

Engineering Manager

Chez Total E&P

De mars 2006 à août 2006
Export Debottlenecking Pipeline - Yemen 30 M$ Basic and Detail engineering, followed by Construction Call for Tender (CFT) issuance Project Description: The aim of this project was to increase the export capacity of the existing 10'' export pipeline with a maximum working pressure of 45 bars ...
Lire la suite
 

Project Engineer

Chez Secomat

De septembre 2005 à janvier 2006
CO2 Import Terminal Project- France 60 M$ CO2 Import Terminal Project- France 60 M$ Project Description: Installation of a CO2 terminal for import of liquefied CO2 by ships and distribution by road tankers. * Engineering, Procurement, Construction of storage capacities and ...
Lire la suite
 

Project Engineer

Chez Secomat

De septembre 2005 à janvier 2006
CO2 Import Terminal Project- France 60 M$ CO2 Import Terminal Project- France 60 M$ Project Description: Installation of a CO2 terminal for import of liquefied CO2 by ships and distribution by road tankers. * Engineering, Procurement, Construction of storage capacities and ...
Lire la suite
 

Project Engineer

Chez Secomat

De septembre 2005 à janvier 2006
CO2 Import Terminal Project- France 60 M$ CO2 Import Terminal Project- France 60 M$ Project Description: Installation of a CO2 terminal for import of liquefied CO2 by ships and distribution by road tankers. * Engineering, Procurement, Construction of storage capacities and ...
Lire la suite
 

Project Engineer

Chez Technip

De août 2004 à juillet 2005
Taweelah Project 62 M$ Project Description: Taweelah project is a Lump Sum turnkey contract awarded by Dolphin Energy limited for a new terminal to receive and distribute natural gas from Qatar to UAE. * Coordination of all detail engineering and Procurement for the project, referring ...
Lire la suite
 

Project Engineer

Chez Technip

De août 2004 à juillet 2005
Taweelah Project 62 M$ Project Description: Taweelah project is a Lump Sum turnkey contract awarded by Dolphin Energy limited for a new terminal to receive and distribute natural gas from Qatar to UAE. * Coordination of all detail engineering and Procurement for the project, referring ...
Lire la suite
 

Project Engineer

Chez Technip

De août 2004 à juillet 2005
Taweelah Project 62 M$ Project Description: Taweelah project is a Lump Sum turnkey contract awarded by Dolphin Energy limited for a new terminal to receive and distribute natural gas from Qatar to UAE. * Coordination of all detail engineering and Procurement for the project, referring ...
Lire la suite
 

Field Engineer

Chez Technip

De juillet 2003 à août 2004
Project Description: The NEB project phase 1 (lump sum turnkey) is aimed at increasing the oil production capacity from two fields 50 Km south west of Abu Dhabi City: -Al Dabb'iya field that is considered as an offshore fields -Onshore Rumaitha field, located in a desert area, 30Km south of Al ...
Lire la suite
 

Field Engineer

Chez Technip

De juillet 2003 à août 2004
Project Description: The NEB project phase 1 (lump sum turnkey) is aimed at increasing the oil production capacity from two fields 50 Km south west of Abu Dhabi City: -Al Dabb'iya field that is considered as an offshore fields -Onshore Rumaitha field, located in a desert area, 30Km south of Al ...
Lire la suite
 

Field Engineer

Chez Technip

De juillet 2003 à août 2004
Project Description: The NEB project phase 1 (lump sum turnkey) is aimed at increasing the oil production capacity from two fields 50 Km south west of Abu Dhabi City: -Al Dabb'iya field that is considered as an offshore fields -Onshore Rumaitha field, located in a desert area, 30Km south of Al ...
Lire la suite
 

Structural Engineer & Coordinator

Chez Technip

De février 2003 à juillet 2003
Miscellaneous Offshore Projects - UAE & Turkmenistan Areas of Expertise Project from Concept, Basic engineering or Feed to EPCC execution. HAZOP, HAZID, Project Technical and Construction review, multi discipline knowledge (Process,Piping, E&I, Civil, Structure, Telecom), Procurement, ...
Lire la suite
 

Structural Engineer & Coordinator

Chez Technip

De février 2003 à juillet 2003
Miscellaneous Offshore Projects - UAE & Turkmenistan Areas of Expertise Project from Concept, Basic engineering or Feed to EPCC execution. HAZOP, HAZID, Project Technical and Construction review, multi discipline knowledge (Process,Piping, E&I, Civil, Structure, Telecom), Procurement, ...
Lire la suite
 

Structural Engineer & Coordinator

Chez Technip

De février 2003 à juillet 2003
Miscellaneous Offshore Projects - UAE & Turkmenistan Areas of Expertise Project from Concept, Basic engineering or Feed to EPCC execution. HAZOP, HAZID, Project Technical and Construction review, multi discipline knowledge (Process,Piping, E&I, Civil, Structure, Telecom), Procurement, ...
Lire la suite
 

Ecole Nationale Supérieure Des Arts Et Métiers (ENSAM) ParisTech, Paris

Master's Degree, Ecole Nationale Supérieure des Arts et Métiers (ENSAM) ParisTech

De septembre 1999 à juin 2002
Ecole Nationale Supérieur des Arts et Métiers (ENSAM Paris Tech) Relevant courses: International Management, Multidiscipline Engineering Expertise * Strong Experience in project management from Concept, Pre-project, Basic or Feed to Detail Engineering, Construction, Pre-commissioning, ...
Lire la suite
 

French National Engineering School Of Arts Et Métiers (ENSAM)., Paris

Master's Degree, French National Engineering School of Arts et Métiers (ENSAM).

De septembre 1999 à juin 2002
Ecole Nationale Supérieur des Arts et Métiers (ENSAM Paris Tech) Relevant courses: International Management, Multidiscipline Engineering Expertise * Strong Experience in project management from Concept, Pre-project, Basic or Feed to Detail Engineering, Construction, Pre-commissioning, ...
Lire la suite
 

French National Engineering School Of Arts Et Métiers (ENSAM)., Paris

Master's Degree, French National Engineering School of Arts et Métiers (ENSAM).

De septembre 1999 à juin 2002
Ecole Nationale Supérieur des Arts et Métiers (ENSAM Paris Tech) Relevant courses: International Management, Multidiscipline Engineering Expertise * Strong Experience in project management from Concept, Pre-project, Basic or Feed to Detail Engineering, Construction, Pre-commissioning, ...
Lire la suite
 

Compétences

 
  • approved design
  • Business Development experience
  • Commissioning support
  • Contract preparation
  • Engineering Coordination/Management
  • Firefighting
  • FPSO
  • HAZID
  • Voir toutes les compétences (26)

Langues parlées

 
  • français
  • arabe
  • anglais
  • allemand